Independence KS Neighborhood Revitalization Tax Rebate: City vs. County Rules

October 29, 2026
Do you want content like this delivered to your inbox?
A modest red-brick single-story home with a shallow covered porch, broad autumn lawn and mature bur oak.

The Montgomery County Commission's October 26 agenda included a line about a metal building on a county road with an Independence address. The application proposes enlarging it from 22 by 36 feet to 28 by 50 feet. The item was a Neighborhood Revitalization "Part 1" application. It sat next to a second one for a new 80-by-60-foot building on a county road near Neodesha. KGGF Radio previewed the meeting as commissioners considering "two neighborhood revitalization plans." Both items were individual project applications filed under a plan that already exists.

The agenda item shows the sequence. That shop is on a county road, so under the county's plan the Commission has to approve the project before construction starts. Had the same addition been built inside Independence city limits, the owner would have applied after the city building permit was issued. The tax break is the same, and the rulebook depends on which side of the city limit the parcel sits.

The steps run in opposite order at the city limit

Both plans offer a 10-year rebate on the property tax from the value an improvement adds. The paperwork follows a different calendar in each.

Under the City of Independence plan, the deeded owner files with the City Clerk within 60 days after the city building permit is issued. If the project needs some other city permit and no building permit, the 60 days start when that permit is issued. Work that starts before the required permit is pulled does not qualify. Work that needs no permit at all does not qualify either.

Under the Montgomery County plan, the order flips. The plan states that "the Montgomery County Commission must approve the application prior to commencement of construction. THERE WILL BE NO EXCEPTIONS!" The County Clerk or County Appraiser is to notify the applicant of approval or denial within 20 working days. Part 2 comes after the work is finished. It includes receipts or an itemized cost statement plus the $100 nonrefundable fee. Before construction, there is also a preliminary site check for compliance with the county sanitary code, county floodplain regulations and land-use classifications. Later, the County Appraiser may inspect the site, take measurements and take photographs.

Here's how one small project, a shop addition, would move through each plan:

  1. Inside city limits: pull the city building permit, start work, and file the rebate application with the City Clerk within 60 days of the permit date, including the $100 fee payable to the Montgomery County Appraiser.
  2. Outside city limits: file Part 1 with cost estimates, wait for County Commission approval, then build. After completion, file Part 2 with receipts and the $100 fee.

The county order catches people who are used to how things work in town. Pouring a slab the weekend the contractor has an opening is fine on a city lot, as long as the permit is in hand and the 60-day clock is watched. On a county parcel, an early start can take the project out of the program.

The size of project that qualifies also changes

The two plans set different minimums.

City of Independence plan Montgomery County plan
Where it applies Most property inside city limits, subject to plan exclusions Everywhere in the county outside city limits
Minimum investment $5,000 on residentially zoned property; $10,000 on other property $10,000
Required value increase Improvement must raise appraised value At least $10,000 or 10% increase in valuation
When to apply Within 60 days after the permit is issued Approval required before construction begins
Fee $100, payable to the County Appraiser $100, filed with Part 2
Rebate schedule Up to 100% years 1–5, 50% years 6–10 100% years 1–5, 50% years 6–10, less a 5% administrative fee
Plan period 2025–2035 2022–2027

The city plan says outright that cosmetic upgrades and minor repairs that don't raise appraised value won't qualify. Driveways and sidewalks can count if they increase value. It also covers permanent accessory structures, which brings detached garages and outbuildings on city lots into the program.

The county plan has two rules the city plan lacks. A property owner who receives a Homestead Refund is disqualified from Neighborhood Revitalization, and that has to be documented on the application. The plan also excludes USD capital outlay taxes from the rebate. On a county parcel, part of the tax bill is never rebated, even in the 100% years.

What gets rebated is the added value

Both plans calculate the rebate the same way. The base value is the average appraised value of the parcel over the three tax years before the application. The rebate applies only to the difference between that base and the appraised value after the improvement is finished. The county plan says it plainly: "Refunds are based on the initial qualified rebate value only, NOT the total tax bill."

The tax bill doesn't shrink up front. The owner pays the full bill, and the rebate comes back as a check. Under the county plan, that check, minus the 5% administrative fee, goes out within 30 days after the county distributes tax collections. Taxes have to stay current. The county plan lists December 20 and May 10 as the due dates. Under both plans, a delinquency on any real estate or personal property tax anywhere in Montgomery County affects eligibility.

Rebates don't start until the work is done. Under both plans, the year of incomplete construction earns nothing, and projects have two years from approval to finish. The city plan allows one written request for an extension of up to 12 months. The request has to reach the City Commission at least 30 days before the original deadline.

These checks do add up. The Independence Daily Reporter reported in February 2026 that $281,422.91 in Neighborhood Revitalization rebate checks were going out. In August 2026, the Daily Reporter reported roughly $650,000 in total tax dollars tied to rebates sent in late June, with $164,000 of that as the County's share. Those totals cover the program broadly and are not broken out for Independence alone.

In most sales, the rebate ends at closing

This is where the rebate affects a sale. Both plans make it non-transferable, apart from a few city-plan exceptions covered below. In an ordinary sale, it becomes ineligible for any further rebate, and the rebate isn't prorated for the year of the sale.

For a buyer, a home with a new addition or a big shop may come with a seller who has been getting rebate checks. Those checks stop when the deed changes hands. The buyer should budget for the full tax bill on the improved value. Under the city plan, a new owner who makes new qualifying improvements can file a new application for that project.

For a seller, the remaining years of the rebate go away at closing, including any partial share for that year. That's worth factoring into the timing of a sale if the improvement is only a year or two old.

The city plan has three exceptions. A bona fide developer, meaning someone actively in the development business with a track record or a business plan, can pass eligibility to the first buyer. After that sale, the rebate ends. A surviving spouse keeps eligibility when a jointly owned property passes to them. A spouse who receives the property in a divorce settlement also keeps eligibility. The county plan's transfer rule, as written, lists no exceptions.

Two plans, two calendars

The city's current plan, the "Neighborhood Revitalization Plan and Development Incentive (2025 – 2035)," was adopted by Ordinance No. 4478 on February 13, 2025. It replaced eight earlier city plans that had different terms. Applications approved under those older plans keep their original terms. Work must start on or after January 1, 2025. The City, Montgomery County, USD 446 and Independence Community College participate, and the agreement runs through December 31, 2035. The full text is in Independence Community College's February 2025 board packet.

The Montgomery County plan is titled for 2022 through 2027 and applies to construction started on or after March 1, 2022. Its participating taxing units are Montgomery County, USD 436, USD 445, USD 446, USD 447, Coffeyville Community College and Independence Community College. The Part 1 and Part 2 forms are in the same county PDF. The October 26 agenda shows the plan is still taking applications this fall. If you're planning a rural project that would finish near the end of that title period, ask the County Appraiser's office which plan will apply before you sign with a contractor.

Questions Montgomery County owners ask

My acreage has an Independence mailing address. Which plan covers it? The deciding line is the city limit, not the mailing address. The county plan covers everything outside the corporate limits of any city. The county-road shop on the October agenda has an Independence address, and it went through the county process.

Does a new house qualify, or only additions? Both plans include new construction. The city plan lists new construction, rehabilitation, alterations and additions. The county plan covers new construction and additions to residential and agricultural structures.

Can I file more than one application for the same project? No. Both plans allow one application per project.

This post is general information about two published local plans. It isn't legal, tax or financial advice, so confirm how either plan applies to your property with the County Appraiser's office and your own tax professional.

If you're weighing a property where a shop, an addition or a new build is part of the plan, it helps to know before you make an offer whether the parcel falls under the city's rulebook or the county's. Kristina Fulk can help you sort out which side of the line a property sits on, and what a seller's recent improvements mean for your tax bill once the keys change hands.

Find Your Dream Home

Browse active listings in the area or contact us for off-market listings.

Home Search

What's Your Home Worth?

Have an expert help you find out what your home is really worth.

Home Valuation